Browse projects by type
- Balustrading
- Bandstands & Canopies
- Cast Iron
- Clocks
- Doors
- Ecclesiastical
- Finials and features
- Fountains
- Gates
- Grilles
- Listed Structures
- Memorials & monuments
- Miscellaneous
- Railings
- Rainwater Goods
- Roof lights
- Stairs
- Waterwheels
- Windows
- Bronze
- Brass
- Glasshouses
- Wrought Iron
- Copper
- Pavement Lights
A selection of our recent conservation and new-build projects
Kilburn House, Manchester University
New Build
Removal of steel handrail balustrade no longer compliant with building regulations, and replace with a compliant modern glass and stainless steel solution.
Carlisle City Church
Replication, New Build
We produced one pair of matching cast iron lockable gates complete with fixed cast iron side panels to replicate closely the originals of days gone by.
Alton Towers' Chinese Pagoda Fountain
Restoration
In-situ restoration of the Grade II* listed cast iron pagoda fountain at Alton Towers.
Tatton Park Mansion House Gates
Restoration
The sensitive restoration of two sets of Grade I Listed late eighteenth-century Italian wrought iron gates, side panels and railings to Tatton Park’s Mansion house courtyard, with removal of old paint and corrosion, repair of locks and replacement of missing iron details.
St Marys School, Hinckley
Restoration
We restored and reglazed two cast iron windows each measuring approx. 2m high x 1m wide.
Manchester Cathedral Balustrade
New Build
Two runs of handrail balustrade to the pulpitum, situated on each side of the new organ.
Nottingham City Hall
Modification
We increased the height of 12 No. existing bronze baluster posts by 150mm.
Chester's Storyhouse Theatre
Restoration, New Build
The restoration of the exisitng brass staircase handrails, and the design and manufacture of two Art Deco podium balustrades.